The General Binding Rules are the conditions that allow a qualifying small sewage discharge in England to operate without an individual Environment Agency environmental permit. Every rule relevant to that discharge must be met. A tank being old, recently emptied or apparently working does not establish that on its own. [12, 13]
This guide explains the main checks for homeowners, buyers, building surveyors and solicitors. It covers England; Wales, Scotland and Northern Ireland have separate regulatory arrangements. [4]

The responsible person is called the operator. This is usually the property owner, may be several owners where a system is shared, or can be someone responsible under an agreement. The assessment concerns the complete treatment and discharge arrangement, including where the liquid finally goes. [4]
| Discharge destination | GBR volume limit | Treatment arrangement |
|---|---|---|
| Ground | 2 m³ a day 2,000 litres | Septic tank or treatment plant, with a suitable drainage field. |
| Surface water | 5 m³ a day 5,000 litres | Suitable sewage treatment before discharge to the receiving water. |
These are discharge volumes per day, not tank sizes. Being below the limit is only one condition. [12] Use the Environment Agency’s domestic discharge calculator for houses and flats, including all properties connected to a shared system. [8]
The sewage must be domestic in nature. This can include normal toilet, washing and cooking wastewater from some business premises; industrial or other trade effluent needs a different assessment. [9]
Yes. Establish when the discharge began and what has changed since. The current rules use three date bands. [1]
| Discharge history | Rules to check |
|---|---|
| Before 1 January 2015 | The rules applicable to all discharges of that type, provided later changes have not moved it into another category. |
| 1 January 2015 to 1 October 2023 | The basic rules plus the additional requirements for discharges started on or after 1 January 2015. |
| On or after 2 October 2023 | The above requirements plus the two additional rules for new discharges introduced from this date. |
A change from ground to surface water, or vice versa, moving the discharge more than 10 metres, or increasing it above the relevant daily limit can change its classification. Buying a house does not itself create a new discharge. Review the installation and alteration history rather than using the purchase date. [5, 6]
Yes, where the complete treatment system and discharge meet the applicable requirements. A conventional septic tank on its own does not provide the treatment required for a direct watercourse discharge under the General Binding Rules. [3]
A system containing a septic tank may have a suitable secondary treatment stage. The Environment Agency allows qualifying secondary treatment arrangements that meet the relevant standards; other arrangements require a permit assessment. A permit is permission for a specified discharge, not blanket approval for any tank or outlet. [3, 10]
Identify every treatment stage and the final outlet. Clear-looking water is not evidence, on its own, that the required effluent quality is being achieved.
For an explanation of the equipment itself, read What Is a Sewage Treatment Plant?
Establish the actual receiving arrangement. A drainage field distributes effluent through the soil for further treatment. A rainwater crate soakaway is not a substitute. Wastewater discharges through wells or boreholes cannot meet the General Binding Rules; a permit is not available where such a system discharges sewage effluent directly into groundwater. [2]
Where a new drainage field is proposed, arrange the appropriate foul-water percolation testing and design assessment. A rainwater infiltration result alone does not establish that a wastewater drainage field is suitable.
Read What Is a Drainage Field? for the differences between effluent drainage, rainwater soakaways and garden land drains.
Check groundwater source protection, nearby drinking-water supplies, protected habitats, the receiving water and proximity to public foul sewers. Which checks apply depends on the discharge route and history. Use the Environment Agency’s full route-specific guidance for the site assessment. [1, 2, 3]
For a ground discharge, source protection zone 1 includes the area within 50 metres of a well, spring or borehole supplying water for domestic or food-production use, and may extend farther. Check this even for an older installation. [12, 13]
For discharges from 1 January 2015, check the public-sewer distance rules. For a single home, the 30-metre test is measured from the premises boundary, not the tank; other developments need a different calculation. New discharges must connect where reasonable. [3, 5]
For discharges from 1 January 2015, the receiving watercourse must normally flow year-round. Routine seasonal drying is different from exceptional drought. Winter flow alone does not establish suitability. [3]
For new discharges from 2 October 2023, also check nearby exempt discharges within 50 metres and combined volumes where outlets are shared. These are additional checks, not retrospective requirements for every unchanged older installation. [1]
No. Assess the applicable requirements and actual condition. The Environment Agency refers to the British Standard in force when each component was installed. Systems installed before 1983 do not have to meet the British Standard requirement, but must meet the other rules that apply. Age is neither an automatic failure nor a general exemption. [2]
Record the evidence supporting the installation date. An owner’s estimate, a dated invoice and a Building Control record provide different levels of certainty. If a newer tank connects to an older drainage field, record both histories rather than assigning one date to the whole system.
Also check that the treatment system has enough capacity for the premises it serves. The daily exemption limit does not demonstrate that a particular tank or drainage field is adequately sized. [12]
The next step is to establish whether it can be brought within the rules or connected to a public foul sewer. If neither is possible, an environmental permit application is required. A discharge outside the General Binding Rules may operate lawfully under an appropriate permit. [6]
Standard rules permits are available for qualifying activities; other proposals need a bespoke assessment. The Environment Agency decides whether the proposal is acceptable. Applying does not guarantee approval. A permit also does not grant rights to discharge across somebody else’s land. [10]
If a permit already exists, obtain the actual document and assess the installation against its conditions. Do not assume that a permit for an earlier arrangement covers a later alteration. [11]
Operate and maintain the system correctly, using competent people and authorised sludge disposal. Keep servicing and repair records. Prevent pollution and properly decommission a system when it is permanently taken out of use. [1, 12]
Follow the manufacturer’s servicing and desludging instructions. For systems operating under the General Binding Rules, Environment Agency guidance advises desludging at least annually or in accordance with those instructions, before sludge exceeds the system’s capacity. [2]
Where there is an environmental permit, follow its particular maintenance, inspection and record requirements. Warning signs include sewage odours, ponding around a discharge area, sludge escaping or unusual foam at an outfall. Investigate these promptly; suspected pollution should be reported to the Environment Agency. [11]
On sale, the operator must give the new operator written information identifying the sewage discharge, describing the system and explaining its maintenance requirements. [1] For the purchase file, also request:
A useful report should connect each conclusion to the relevant evidence. For example, confirming the tank type does not establish the final discharge route. If that route is missing from the records, the investigation should explain how it was established or why it remains unresolved.
Arrange the assessment early enough for the buyer, surveyor and solicitor to review any outstanding points before exchange. Our guide to buying a property with a septic tank covers the wider purchase checks. If a building survey has prompted the enquiry, see Does a Level 3 Home Survey Include a Drainage Survey?
Yes. Where the necessary inspection evidence, records and environmental information are available, Flowcraft can provide a written assessment confirming compliance with the applicable requirements within the agreed scope.
The report should identify whether it assesses the General Binding Rules or a particular permit, what was inspected and which evidence supports the conclusion. Where a necessary point remains unverified, we explain it and the check required to resolve it. A confirmed defect and missing evidence are different findings.
This is a technical compliance assessment. Environmental permits and Building Control approvals are issued by the relevant authorities; legal ownership and drainage rights remain matters for the solicitor. Send the precise question raised by your surveyor, solicitor or lender so the scope addresses it.
No. A qualifying discharge can operate without one when every applicable General Binding Rule is met. Where a permit is required, its conditions govern the authorised discharge. Establish the route, history and site circumstances before deciding. [4, 10]
No. Septic tanks remain an option for appropriate discharges to ground. Avoid treating “2020 compliance” as the whole assessment: the current guidance also distinguishes discharges using the 2015 and 2023 dates. Use the rules applicable to the actual installation and discharge. [2, 5, 6]
Potentially, if suitable further treatment and the discharge arrangement meet the applicable rules or permit conditions. Do not assess only the first tank. Establish what happens to the effluent before it reaches the ditch and the basis on which that discharge is authorised. [3, 10]
No. It records an emptying visit. It does not establish the system’s full condition, discharge destination, treatment performance or environmental position. Keep it with the wider evidence rather than treating it as a compliance certificate.
No. CCTV can provide evidence about accessible pipes and connections. A complete assessment may also need tank inspection, records, discharge tracing, capacity information and environmental checks. The agreed scope should match the questions that need answering.
No. A genuine cesspool stores sewage without an outlet and must be maintained and emptied without leaking or overflowing. An old chamber described as a “cesspit” needs identifying: if it releases wastewater, calling it a cesspool does not make it one. [7]
Not necessarily. The discharge history and changes to its type, location and volume determine the classification. A replacement tank serving an otherwise unchanged arrangement should not automatically be assessed as a wholly new discharge. [5, 6]
Yes. Send us the property details, the question raised and the available records. Where sufficient evidence supports the conclusion, our report can confirm compliance within its stated scope. Any unresolved point is identified clearly so the buyer and their advisers know what remains to be checked.
No. In England, a small sewage discharge that meets all the applicable General Binding Rules does not need to be registered with the Environment Agency. The registration requirement was removed when the rules took effect in January 2015. This does not remove your responsibility to comply: a discharge that requires an environmental permit must have one. [4, 14]
No. The General Binding Rules concern the environmental permit exemption; they do not grant Building Regulations approval or planning permission. New septic tanks and sewage treatment plants require Building Regulations approval, and planning permission may also be needed. For an existing installation, check its history and the approvals relevant to the work carried out. One form of approval does not replace another. [2, 3, 6]
Establish the specific problem, the acceptable solution and the likely cost before deciding how to proceed. Give the report to your solicitor and agree responsibility, timing and any necessary permissions for the work. For a septic tank discharging directly to a watercourse, the Environment Agency advises agreeing responsibility for replacement or upgrading as a condition of sale. A purchase agreement does not itself make the discharge compliant. [3]
Missing records do not automatically prove that the system is non-compliant. The assessment should establish what can be verified through inspection, drain tracing, available plans, equipment details and other reliable evidence. Finding the tank alone does not confirm its discharge destination. If an essential fact remains unresolved, the report should identify it and explain the further check needed. Flowcraft can confirm compliance where sufficient evidence supports that conclusion.
Recalculate the maximum daily sewage discharge and check that the treatment system and receiving drainage arrangement can accommodate it. Include every connected property. Review any permit conditions, the discharge classification and the approvals needed for the proposed work. Remaining below the 2,000-litre ground limit or 5,000-litre surface-water limit does not prove that the existing system has sufficient capacity. Check this before adding the connection. [2, 3, 5, 8]
The Flowcraft services that put this guide into practice.
Related guides for buyers and owners of properties with private drainage.
About the author
Jamie Hopcraft is the director of Flowcraft Groundworks Ltd. His work includes CCTV drainage surveys, drainage investigations and private wastewater assessments for property purchases.
Flowcraft provides private drainage and wastewater surveys across Hertfordshire, Buckinghamshire and Bedfordshire, including Hemel Hempstead, Berkhamsted, Tring and St Albans.
Send the property address, any surveyor’s or solicitor’s questions, available plans and permits, and your timescale. We will review the information, recommend the investigation scope and provide a written quotation.
Guidance checked on 9 October 2026. This guide summarises the main assessment points; use the complete Environment Agency guidance for the rules and technical requirements applicable to an individual discharge.